標題: Wholesale Jerseys improve pressure
duhy6t12a
給你按讚鼠爸媽
Rank: 4



UID 639
精華 0
積分 68535
帖子 22845
威望 68535
金錢 68535
學分 45690
閱讀權限 1
註冊 2017-5-25
用戶註冊天數 2589
用戶失蹤天數 1941
狀態 離線
60.168.49.138
分享 
發表於 2017-7-2 08:15  資料 私人訊息 
Wholesale Jerseys improve pressure
Linden is to benefit from an approved US$12M loan that was granted by the Inter-American Development Bank (IDB) to improve efficiency, quality and sustainability of the drinking water service.According to the IDB,NFL Jerseys From China, the funds will help the city,Arizona Diamondbacks Fernando Rodney Jersey, located 100 kilometers inland from the Atlantic coast, to cut energy use; improve pressure, quality and continuity of the water supply system; reduce the level of revenue loss due to physical and commercial reasons; and strengthen the operation and maintenance performance of the country’s public utility, Guyana Water Incorporated (GWI).IDB said that the five-year programme will help reduce GWI’s annual energy spending in Linden from US$232,Cheap NFL Jerseys,000 to US$140,Wholesale China Jerseys,000, while building and rehabilitating 10 kilometers of mains, reducing non-revenue water (NRW) levels from 65 per cent to less than 50 per cent and bringing water pressure to adequate levels in all households.The Bank’s financing consists of a six million loan from its ordinary capital for a 30-year term, with a six-year grace period and a variable interest rate based on Libor,Cheap NFL Jerseys China, and another credit also of six million from the IDB’s concessional Fund for Special Operations for a 40-year term, with 40 years of grace and 0.25 per cent interest.Works will include construction of two treatment plants to ensure good water quality and of two large reservoirs aimed at ensuring water supply continuity and better pressure in the distribution network.Activities to help reduce NRW include the development of a management plan to address, monitor and control physical and commercial losses, rehabilitation of part of the network,Wholesale Jerseys Free Shipping, and support for a metering program currently under implementation by GWI.Additionally, the programme will address the institutional strengthening needs of GWI in Linden through the preparation of manuals and training activities on operation and maintenance, standard operating procedures, environmental and social safeguards, water quality monitoring procedures, and data collection for monitoring purposes.
頂部