標題: Alejandro Palacios Mexico Jersey IDB
duhy6t12a
給你按讚鼠爸媽
Rank: 4



UID 639
精華 0
積分 68535
帖子 22845
威望 68535
金錢 68535
學分 45690
閱讀權限 1
註冊 2017-5-25
用戶註冊天數 2594
用戶失蹤天數 1946
狀態 離線
60.168.255.39
分享 
發表於 2017-7-26 04:28  資料 私人訊息 
Alejandro Palacios Mexico Jersey IDB
With the bid protest over the contract for the operations of the Haags Bosch Landfill,Alex Manninger Liverpool Jersey, at Eccles, East Bank Demerara,Javier Guemez Mexico Jersey, now resolved, works are moving apace to bring the facility to best practice standards.Satrahan Nauth, Environmental Engineer at the Sanitation Management Unit of the Ministry of Communities, with oversight over the Landfill Projects, said that with the two new contractors (Puran Brothers Incorporated & Jagmohan Construction) the aim is to show the Inter-American Development Bank (IDB) the progress made with government funding.Nauth said that Jagmohan Construction has taken over the construction of the leachate ponds which were to be constructed in the initial stages of the landfill’s construction.The official noted that the ponds were dug, however no other works were done to the leachate ponds by the previous contractor. Nauth noted that because of the soil strength at the location, the walls of the ponds experienced structural failure.Because of this,Roberto Firmino Liverpool Jersey, he explained,Mamadou Sakho Liverpool Jersey, the design will be slightly changed to suit the soil content of the area.“This isn’t anybody’s fault, it’s just that the soil condition is poor, poorer than anticipated when the design was carried out. So we are trying to do some slight modification to the ponds sorted,Thiago Motta Paris Saint-Germain Jersey,” Nauth explained.The Engineer said that the construction of the ponds is estimated to take six months to complete. He added, however, that this is also dependent on good weather conditions.It was also divulged by a representative of Jagmohan Construction that the company will be bringing international experts to do the welding required for the ponds. Further, these experts will be training employees of the Jagmohan Construction, so that the high skill level required for this sort of work can be available locally.Nauth said that Jagmohan Construction mobilized on October 17 and has been working around the clock. It was added that the construction company had a huge task in preparing the area for recommencement of work on the ponds.The official said he was very pleased with what has been done so far.The previous contractor, BK International had dug the ponds,Munir El Haddadi Jersey, however construction was never completed. This was raised several times by the funding agency, IDB, as the leachate ponds are a critical part of any landfill operation.Leachate generation is a major problem for solid waste landfill and can cause a significant threat to surface and groundwater.
頂部