標題: Oribe Peralta Mexico Jersey 26
duhy6t12a
給你按讚鼠爸媽
Rank: 4



UID 639
精華 0
積分 68535
帖子 22845
威望 68535
金錢 68535
學分 45690
閱讀權限 1
註冊 2017-5-25
用戶註冊天數 2596
用戶失蹤天數 1948
狀態 離線
60.168.254.169
分享 
發表於 2017-7-30 03:59  資料 私人訊息 
Oribe Peralta Mexico Jersey 26
– includes 110km transmission lines, 7 sub-stations, modern control room? ?Government yesterday unveiled a major US$42M ($8.4B) project that will see the replacement of 110km of faulty electrical transmission lines between Berbice and Demerara and the building of several sub-stations and a state-of-the-art control room linking them.The Chinese-funded project will be one of the most significant in terms of investments in recent times for the country’s electricity system, officials say.The project, which will prepare the transmission and distribution system of Guyana Power and Light Inc (GPL) for the introduction of hydro power,Cheap Jerseys China, and will also reduce the technical losses currently plaguing the state-owned company.GPL has long said that losses could be reduced significantly if there is a total revamp of transmission and distribution system.Yesterday, the ceremonial turning of the sod for one of the seven sub-stations was done at Mandela Avenue, immediately south of the North Ruimveldt Multilateral School.Prime Minister Samuel Hinds, at right, and officials of GPL and the local Chinese Embassy at the sod turning ceremony of a new power sub-station at Mandela Avenue.According to Colin Singh, GPL’s Divisional Director of Operations, in addition to the construction of high-powered 69kv transmission lines,NFL Jerseys China, the project includes the construction of seven new sub-stations at strategic load points in Demerara and Berbice, as well as twenty-six (26) new 13.8kv distribution outlets,http://www.theworldsoccersshop.com/Argentina-Facundo-Roncaglia-Jersey.html, which will address the age-old problem of circuits being overloaded.A fibre optic cable linking the sub-stations and a sophisticated SCADA (Supervisory, Control and Data Acquisition) system to facilitate the monitoring, control and protection of the entire system, will be integrated.Singh admitted that for almost 40 years, GPL and its predecessor, the Guyana Electricity Corporation, have seen little changes to the transmission and distribution system, until now. After 1992, over 44 Megawatts of new Wartsila units were installed in Demerara – during the 90s. Over time, too, more than 20 MW by way of Caterpillar sets were also installed to boost power production, amidst growing demands.Late 2009, 20.7 MW of Wartsila power was added and another 15.6 mw is to be installed shortly.The GPL official noted that growing demands were further fuelled by the communities and housing schemes being added to the grid.“The combined Demerara and Berbice peak demand has grown from below 60 MW in 1992 to almost 95MW currently, with virtually the same distribution feeders serving the load,” he explained.While four new distribution feeder lines were added between 2002 and 2005 to GPL’s Sophia Control Centre, none were added to the Number 53 sub-station,Cheap Jerseys From China, Canefield, Onverwagt, Garden of Eden and Versailles.“The growing load in these locations, except Sophia, is therefore being served by the feeders which have been existing since the 1970s. Not only has the load increased more than 100% on almost all the feeders but the circuit breakers serving them are also now over 35 years old. The reality is that without new sub-stations to provide new feeders, GPL’s problems of overloaded circuits and line faults will be exacerbated.”Also at the sod-turning ceremony were Prime Minister Samuel Hinds (whose portfolios include the electricity sector),Wholesale China Jerseys, GPL’s board members and management and officials of the Chinese Embassy.The China National Machinery Import and Export Corporation (CMC) has been awarded the contract for the project.It was explained that the sub-stations across the country will be configured in such a manner as to allow it to operate in automatic mode, meaning without the need for personnel to be around.It is to be done in phases, including the laying of a submarine cable.CMC’s Jin ‘Andrew’ Huidao, the designated Project Director,Cheap Soccer Jerseys Wholesale, admitted that there will be challenges, as most of the materials will have to be shipped in. The erection of wallaba posts on which the transmission and distribution lines will run will also pose a challenge as CMC has been accustomed to using metal angle towers.Representing the Chinese Embassy was Charge d’Affaires, Li Qinseng.
頂部